Issues and Stakeholder Management: Difference between revisions

From Useful Data
Jump to navigation Jump to search
Created page
 
Line 25: Line 25:
*The Re-baselining Euphemism.  Wrong: "It's an uncontrolled budget blowout".  Right: "It's an opportunity to realign fiscal scope".
*The Re-baselining Euphemism.  Wrong: "It's an uncontrolled budget blowout".  Right: "It's an opportunity to realign fiscal scope".


*Private Office Softening. Being asked to tone things down.  For example, replace "critical system collapse" to "potential operational friction".
*Private Office Softening. Being asked to tone things down.  For example, replace "critical system collapse" with "potential operational friction".


*Syntactic Anaesthesia.  Use enough acronyms and jargon so nobody reading it will understand it.  "Sub-optimal API ETL interoperability across legacy DBs & the target TOM necessitates tactical EUC/CSV vectors for PII/PVI batch processing post-GDS Gateway 3 and presents baseline variance against mandatory ICO/DPIA SLAs, generating secondary FTE capacity friction across the ALB and escalating latent non-conformance to the SIRO ahead of FBC sign-off".
*Syntactic Anaesthesia.  Use enough acronyms and jargon so nobody reading it will understand it.  "Sub-optimal API ETL interoperability across legacy DBs & the target TOM necessitates tactical EUC/CSV vectors for PII/PVI batch processing post-GDS Gateway 3 and presents baseline variance against mandatory ICO/DPIA SLAs, generating secondary FTE capacity friction across the ALB and escalating latent non-conformance to the SIRO ahead of FBC sign-off".
Line 34: Line 34:


*Optimistic Reframing. Wrong: "Data loss breach".  Right: "An isolated unsolicited information exposure event".
*Optimistic Reframing. Wrong: "Data loss breach".  Right: "An isolated unsolicited information exposure event".


==Reasons to Raise Issues==
==Reasons to Raise Issues==

Revision as of 10:53, 5 October 2026

The relationship between Issue Management and Stakeholder Management

Stakeholder Management and Issues Management are closely related activities for any Project Manager. Working hard at dealing with the project's issues by communicating your intentions and progress in a timely fashion can go a long way toward managing stakeholders' responses and expectations.

For the Cynical Project Manager, careful use of Issues Management does half the work of Stakeholder Management. It also cuts down bureaucracy and the need for lengthy reports or planning.


How to Record Issues - the Cynical Way

The use of Plain English is the Cynical Project Manager's enemy. Avoid its use. Instead, use euphemism: the art of employing administrative terminology to sanitise a catastrophic situation into a mild inconvenience. Two examples are in common use:

  • "It's not a problem. It is an opportunity."
  • "It's not a bug. It's a feature."


But the professional can go further:

  • Whitehall Polish. Wrong: "It’s a complete project failure". Right: "It’s a short-term variance against key milestones".
  • Lexical Homeopathy. Dilute the risk description across enough sub-clauses so that it loses all its potency.
  • The "Challenging" Euphemism. Wrong: "Completely unachievable with current funding". Right: "The deadline is ambitious and stretching but achievable".
  • Passive Voice Absolution. Wrong: "We will breach statutory duties". Right: "There may be a risk that statutory compliance timelines may experience temporal slippage".
  • The Re-baselining Euphemism. Wrong: "It's an uncontrolled budget blowout". Right: "It's an opportunity to realign fiscal scope".
  • Private Office Softening. Being asked to tone things down. For example, replace "critical system collapse" with "potential operational friction".
  • Syntactic Anaesthesia. Use enough acronyms and jargon so nobody reading it will understand it. "Sub-optimal API ETL interoperability across legacy DBs & the target TOM necessitates tactical EUC/CSV vectors for PII/PVI batch processing post-GDS Gateway 3 and presents baseline variance against mandatory ICO/DPIA SLAs, generating secondary FTE capacity friction across the ALB and escalating latent non-conformance to the SIRO ahead of FBC sign-off".
  • The Nuance Trap. Don't call something a risk that has happened. Called it "Actualisation of a previously emerging thematic nuance".
  • Semantic Downgrading. "It's not really an issue so much as a dependency."
  • Optimistic Reframing. Wrong: "Data loss breach". Right: "An isolated unsolicited information exposure event".

Reasons to Raise Issues

  • So you can blame someone else in documentation with an audit trail.